Bathroom remodel cost in Pasadena, CA by scope (2026)
Scope sets the price more than finishes do. A cosmetic refresh keeps everything in place; a full remodel takes the room to the studs; a layout change moves plumbing. The Pasadena models and national data agree on the order, not on the totals:
| Scope | homecostcheck Pasadena, Jun 2026 | Fixr national, Jan 2026 |
|---|---|---|
| Cosmetic: fixtures, paint, vanity | $6,100 to $12,200 | $2,400 to $10,000 (minor) |
| Mid-range full bath: tile, tub/shower, vanity | $14,650 to $30,500 | $6,000 to $25,000 (partial) |
| Major or primary bath, layout change | $34,150 to $73,200 | $9,000 to $30,000+ (full gut) |
Swipe the table sideways to see every column →
homecostcheck adjusts national ranges for Pasadena labor and permit costs. Fixr is national; Los Angeles County prices run above it.
| Source | Date | Figure |
|---|---|---|
| NailThePrice, Pasadena model | Jun 2026 | $7,370 to $30,700, average $14,730; 10 to 30 days |
| Angi, Los Angeles average (read for our niche research) | Oct 2026 | About $20,000; typical $13,000 to $27,000 |
| Fixr, national | Jan 2026 | Average $12,000; most pay $6,000 to $18,000 |
Swipe the table sideways to see every column →

Cost by bathroom type and size
A powder room costs least because it has no shower; a primary bath costs most because it has two of everything. Fixr's national figures by type and size:
| Bathroom | National range |
|---|---|
| Half bath or powder room | $1,200 to $15,000 |
| Guest or hall bath | $3,500 to $20,000 |
| Primary bath | $7,000 to $30,000 |
| 35 sq ft (5x7) | $2,450 to $14,000 |
| 40 sq ft (5x8) | $2,800 to $16,000 |
| 60 sq ft (6x10) | $4,200 to $24,000 |
| 100 sq ft (10x10) | $7,000 to $40,000 |
Swipe the table sideways to see every column →
Fixr's per-square-foot range is $70 to $400, about $120 on average. In Pasadena, expect the top half of each range for anything beyond a cosmetic job.
Where the money goes: line items
Labor is about half of a bathroom remodel. The rest is spread across the shower or tub, tile, fixtures and the systems behind the walls:
| Item | Typical cost | Source |
|---|---|---|
| Labor share | About 50%; $8,100 of a $14,730 Pasadena average | NailThePrice / Fixr |
| Shower or tub replacement | $1,500 to $4,500 standard; up to $10,000 custom walk-in | Fixr |
| Tub-to-walk-in-shower conversion | $3,000 to $7,000 | NailThePrice, Pasadena |
| Moving a fixture (toilet, shower, sink) | $1,000 to $5,000 each | NailThePrice, Pasadena |
| Vanity | $200 builder grade; $500 to $1,500 mid; $2,000 to $5,000+ custom | NailThePrice |
| Vanity top | $360 to $1,100 | Fixr |
| Fixtures (toilet $200 to $600, faucet $75 to $300, showerhead $50 to $225) | $1,200 to $3,600 | Fixr |
| Tile material | Ceramic $2 to $5, porcelain $5 to $15, stone $10 to $40 per sq ft | NailThePrice |
| Tile work outside the shower | $600 to $1,800 | Fixr |
| Permit and inspections, Pasadena | $114 to $456 | NailThePrice |
| Design for a layout change | $600 to $1,700 | Fixr |
| Water damage found in demolition | $500 to $4,500 | Fixr |
Swipe the table sideways to see every column →
NailThePrice Pasadena (updated June 2026); Fixr national (updated January 2026).

What pushes a Pasadena bathroom quote up
Pasadena quotes run higher than the national tables for reasons that have more to do with the houses than the finishes:
The age of the house
- Galvanized supply pipe that should be replaced while the walls are open
- No dedicated bathroom circuit: the City's handout wants a 20-amp GFCI circuit serving only bathroom receptacles
- A window in the shower wall that has to become tempered glass
- Civil Code 1101.4: on a pre-1994 house the permit brings every old toilet, showerhead and faucet in the house up to current flow rates
- Paint from before 1978, which means lead-safe work practices for paid work
Choices you make
- Moving the toilet or shower drain
- A curbless shower, a linear drain or a steam shower
- Natural stone tile or large porcelain slabs
- Frameless glass instead of a framed door
- A custom or furniture-style vanity
Spending less without cutting the wrong corner
The parts worth paying for are the ones behind the tile: the waterproofing, the valve, the fan venting outside and the circuit. Savings are safer in the finishes: porcelain instead of stone, a stock vanity, a framed glass door, a reglazed tub instead of a new one. If you are pricing an acrylic liner instead, the one-day bath remodel vs full remodel page sets those quotes against tile. For a full picture of the work see the bathroom remodel in Pasadena page, plus tub-to-shower conversions, primary baths and small baths. Permit costs and steps are in the permit guide; the fixture rule is in the Title 24 and CALGreen guide.


